Public Works Engineering Design Standards

NOTICE TO DEVELOPERS!

Town adopted the new Standards per Resolution No. 2724 on April 7, 2022.

All development permitted after April 7, 2022, shall be subject to the new design standards. Contact Community Development and Planning with questions.

Download the complete Engineering and Design Standards (Searchable PDF) or see below for Sections and Standard Plan Index.

Table of Contents
Section 1 - Overview (PDF)
Section 2 - Project Application and Certification (PDF)
Section 3 - General Utilities (PDF)
Section 4 - Sanitary Sewer Specifications (PDF)
Section 5 - Sewage Pump Stations (PDF)
Section 6 - Stormwater (PDF)
Section 7 - Water (PDF)
Section 8 - Streets (PDF)
  1. GENERAL UTILITY
  2. SEWER
  3. STORM
  4. STREET
  5. WATER 
Standard Drawings Download .PDF Download .DWG
General Notes U-0 (PDF) U-0 (DWG)
Typical Utility Locations U-1 (PDF) U-1 (DWG)
W, S, and SW Trench Section U-2 (PDF) U-2 (DWG)
Dry Utility Layout U-3 (PDF) U-3 (DWG)
Dry Utilities and Water Main Section U-4 (PDF) U-4 (DWG)
Power/Communication Trench Section in Rock U-5 (PDF) U-5 (DWG)
Dry Utility Section U-6 (PDF) U-6 (DWG)
Trench Pavement Restoration U-7 (PDF) U-7 (DWG)
HMA Diamond Patch U-8 (PDF) U-8 (DWG)