- Home
- Government
- Departments
- Planning
- Forms and Fees
Forms and Fees
Community Development and Planning Office Hours:
Monday - Friday 8:30 a.m. - noon & 1:00 p.m. - 4:30 p.m.
To schedule an inspection or meeting with the CDP Director, contact Janelle at (360) 378-2810 ext 248 or permits@fridayharbor.org.
How to Submit Your Application
Submit all permit applications, plans, and associated documents electronically to:
permits@fridayharbor.org
About Our Forms
- If you are unsure of which forms you need, contact us at permits@fridayharbor.org.
- Our forms are in Portable Document Format (.pdf). Use Adobe Acrobat Reader for full functionality (i.e., form fields and auto-calculations).
- If you choose to download and save forms for future use, please check our site periodically to ensure you have the latest version of the application(s) you wish to submit.
For Your Building Projects
Go to Building Division to find checklists used for reviewing your permits.
2021/2018 WSEC Commercial Compliance is only available as a webtool. Use the following link for WSEC Webtool General Information: https://waenergycodes.com/web_tool_forms.php?energy_code=2018
For Your Shoreline Projects
For JARPA information, instructions/guidance, and attachments, visit: https://www.epermitting.wa.gov/site/alias__resourcecenter/jarpa_jarpa_form/9984/jarpa_form.aspx
Historic Preservation Review Process
Complete a Review Application & contact Town Hall to schedule a project for review by the Historic Preservation Review Board.
The Historic Preservation Review Board (HPRB) must receive 7 (seven) sets of the materials outlined below, on 8.5”x 11” paper, 2 weeks preceding the HPRB meeting. This allows staff adequate time to prepare support materials and Board members an opportunity to thoroughly review documents.
In order to provide help with design solutions and offer informed recommendations to applicants during the review process, the HPRB relies upon the following applicant information:
- A comprehensive written description of the proposed modifications to the existing building or of the proposed new construction including scope of work, materials, areas of demolition/new construction, etc.
- A site plan to scale that indicates the dimensions of the lot, the location of existing buildings, and the location of additions or new buildings. Also to be indicated: parking, signs, fencing, & landscaping.
- A plan to scale showing elevations, and section drawings. Drawings should include materials to be used, window design, signs, exterior lighting with keyed dimensions.
- Detailed drawings of new or altered architectural features and trim.
- A description or sample of new exterior materials to be used, including the types of windows, roofing, and siding. Product pamphlets describing the materials/products you propose to use can be obtained from the product vendor and/or from their websites online.
- Photographs: When the HPRB is reviewing projects within the Historic District, it is helpful to have photographs of applicable buildings, sites, and streetscapes. Applicants are encouraged to include vintage or contemporary photographs that illustrate what you are proposing. Look around Friday Harbor, can you find examples of similar features that will demonstrate your concept?
Complete List of Applications and Forms
- Address Request Application
- Blasting Permit Application
- Boundary Line Adj. / Mod. Application
- Building Height Instructions
- Building Permit Application (Simple)
- Building Permit Application Packet
- Code Enforcement Investigation Request Form
- Community Event Sign Permit
- Comprehensive Plan Change Request
- Conditional Use Application
- Demolition Permit Application
- Energy Calculations (Multi-family)
- Energy Calculations (Single Family)
- Engineering Alternative Design Application
- Environmental Checklist - SEPA
- Event Permit Application
- Final Long Plat Application
- Final Short Plat Application
- Fire Alarm / Fire Sprinkler Permit Application
- Land Clearing, Grading, or Filling Permit Application
- Long Subdivision Application
- Manufactured Home Application
- Mechanical Permit Application
- Moving Permit Application
- Mural Application
- Parade Permit Application
- Parking Complaint
- Planned Residential Development Application
- Plumbing Permit Application
- Pre-Development Meeting Packet
- Preliminary Short Subdivision Application
- Private Use of Public Property
- Residential Exempt Accessory Structure
- Rezone Application
- Right of Way Application
- Right of Way Use License (Article II, Structures) Application
- Roofing Permit Application
- Sewer Service Application
- Shoreline Development Permit Exemption Application
- Shoreline Permit Application - JARPA
- Shoreline Permit Revision
- Sign Permit Application
- Sign Variance Application
- Site Plan Review Application
- Site Plan Review Client Checklist Non-SFR
- Special Parking Permit
- Stormwater Plan Application
- Stormwater Service Application
- Street Closure Application
- Street Vacation
- Tenant Improvement Packet
- Variance Application
- Water Service Application
- Water Service Connection Questionnaire
- Water Sewer System Extension
- Water Sub-Meter Information
-
Ryan Ericson
Community Development & Planning Director