STREET AND STORM DRAINAGE STANDARDS

SECTION 7. - STANDARD DETAILS

These documents are in Adobe Acrobat (.pdf) format. In order to view or print these files, you first need to have Adobe's Acrobat Reader(c) installed on your computer. This software is available free from Adobe.

 

STREET DETAILS

TITLE  DRAWINGS
Major Arterial Street Section

4-1

Minor Arterial-60’RW Street Section

4-2

Minor Arterial - 50’RW Street Section

4-3

RES 40’ RW Street Section

4-4

RES 50’ RW Street Section

4-4a

Local Access Street Section

4-5

Typical Bumpout Detail

4-6

Sight Distance Detail

4-7

Trench-Pavement Restoration

4-8

Utility Trench Section, Type A

4-9a

Utility Trench Section, Type B

4-9b

Power/Communication Trench Section

4-9c

Power/Communication Trench Section in Rock

4-9d

Cement Concrete Driveway with Planter Strip

4-10a & b

Cement Concrete Driveway Without Planter Strip

4-11

Sidewalk without Planter Strip

4-12

Sidewalk with Planter Strip

4-13

Curb Ramp

4-14 (1,2,3,4,5,6)

Curb Ramp Location Detail

4-15

Concrete Curb and Gutter

4-16

Turn Arrow Details

4-17

Pavement Markings

4-18

Parking Space Markings

4-19

Mailbox Detail

4-20

Precast Monument Case and Cover

4-21

Cast in Place Concrete Surface Monument

4-22

Rock Wall Detail

4-23

Luminaire Foundation

4-24

STORM DRAINAGE AND SEDIMENTATION AND EROSION CONTROL DETAILS

TITLE DRAWINGS
Flow Dispersion Trench

5-1

Rock Outfall (Culvert Discharge Protection)

5-2

Quarry Spall and Gravel Filter "Window"

5-3

Orifices - Tee Riser

5-4

Overflow Structure #1

5-5

Flow Restrictor/Oil Pollution Control Device

5-6

Orifices - Baffle

5-7

Typical Detention Vault (Dry/Wet)

5-8

Schematic of an Infiltration Trench

5-9

Solid Locking Lid

5-10

Infiltration Trench Sump Structure (Residential)

5-11

Pipe Anchor Detail

5-12

Debris Barrier

5-13

Catch Basin Type 1

5-14

Frame and Grate

5-15

Catch Basin/Concrete Inlet Detail for Steep Slopes

5-16

Oil/Water Separator/Flow Restrictor Catch Basin Type 2

5-17

Inlet Fabric Fence Filter

5-18

Inlet Block and Gravel Filter Schematic

5-19

Temporary Sediment Control Inlet Gravel and Filter Fabric

5-20

Construction Entrance Rock Pad

5-21

Sediment Pond - Example

5-22

Sediment Pond Cross-Section

5-23

Riser Detail

5-24

Permanent Sediment Trap for Presettling Basin

5-25

Placement of Temporary Sedimentation Pond Baffles - Schematic

5-26

Filter Fabric Fence Detail

5-27

Straw and Hay Bale Barriers - Schematic

5-28

Straw and Hay Bale Barriers

5-29

Brush Barrier - Schematic

5-30

Gravel Filter Berm

5-31

Sandbag Berm

5-32

Storm drainage and erosion control details are from the King County Stormwater Manual.

07/02/2012

 

Neither the Town of Friday Harbor nor any agency, officer, or employee of the Town warrants the accuracy, reliability or timeliness of any information presented here, and shall not be held liable for any losses caused by such reliance on the accuracy, reliability or timeliness of such information.
Portions of such information may be incorrect or not current. Any person or entity who relies on any information obtained from the system, does so at his or her own risk.

Copyright © 2017 Town of Friday Harbor Washington.  All rights reserved.