| Section |
Subject |
Page |
| |
|
|
| 1. |
INTRODUCTION |
1-1 |
| |
|
|
| 1A. |
DEFINITIONS |
1-1 |
| |
|
|
| 1B. |
GENERAL
CONSIDERATIONS |
1-2 |
| 1B.01 |
General |
1-2 |
| 1B.02 |
Design Standard
Guidelines |
1-2 |
| 1B.03 |
Changes to
Standards |
1-2 |
| |
|
|
| 2. |
RIGHT-OF-WAY
REQUIREMENTS AND PERMIT PROCESS |
2-1 |
| |
|
|
| 2A. |
RIGHT-OF-WAY
REQUIREMENTS |
2-1 |
| 2A.01 |
General |
2-1 |
| |
|
|
| 2B. |
PERMIT PROCESS |
2-1 |
| 2B.01 |
General |
2-1 |
| 2B.02 |
Requirements |
2-1 |
| |
|
|
| 2C. |
VARIANCES |
2-3 |
| 2C.01 |
General |
2-3 |
| |
|
|
| 2D. |
PLAN CHECKLIST |
2-4 |
| |
|
|
| 3. |
PUBLIC WORKS
CONSIDERATIONS |
3-1 |
| |
|
|
| 3A. |
BONDING |
3-1 |
| |
|
|
| 3B. |
LIABILITY
INSURANCE |
3-1 |
| |
|
|
| 3C. |
INSPECTION |
3-2 |
| 3C.01 |
General |
3-2 |
| 3C.02 |
Final
Inspection |
3-2 |
| |
|
|
| 3D. |
TRAFFIC CONTROL |
3-2 |
| 3D.01 |
General |
3-2 |
| 3D.02 |
Notice to Town |
3-2 |
| |
|
|
| 3E. |
CALL BEFORE YOU
DIG |
3-2 |
| |
|
|
| 3F. |
AS-BUILT
DRAWINGS |
3-3 |
| 3F.01 |
General |
3-3 |
| 3F.02 |
Drawing
Standards |
3-3 |
| |
|
|
| 4. |
STREET
STANDARDS |
4-1 |
| |
|
|
| 4A. |
GENERAL
CONSIDERATIONS |
4-1 |
| 4A.01 |
General |
4-1 |
| |
|
|
| 4B. |
STREETS
|
4-1 |
| 4B.01 |
Functional
Classification |
4-1 |
| 4B.02 |
Right-of-Way |
4-3 |
| 4B.03 |
Street Frontage
Improvements |
4-3 |
| 4B.04 |
Signing |
4-3 |
| 4B.05 |
Street Names |
4-4 |
| 4B.06 |
Street Design
Standards |
4-4 |
| 4B.07 |
Cul-de-Sac
Street |
4-8 |
| 4B.08 |
Temporary Dead
End |
4-8 |
| 4B.09 |
Intersections |
4-8 |
| 4B.10 |
Sight Distance
for Intersections |
4-9 |
| 4B.11 |
Driveways |
4-10 |
| |
|
|
| 4C. |
SIDEWALKS,
CURBS AND GUTTERS |
4-13 |
| 4C.01 |
General |
4-13 |
| 4C.02 |
Design
Standards |
4-13 |
| 4C.03 |
Vaults in
Sidewalks |
4-13 |
| 4C.04 |
Testing |
4-13 |
| |
|
|
| 4D. |
ILLUMINATION |
4-13 |
| 4D.01 |
General |
4-13 |
| 4D.02 |
Design
Standards |
4-14 |
| |
|
|
| 4E. |
SIGNALS
(SECTION RESERVED) |
4-16 |
| |
|
|
| 4F. |
ROADSIDE
FEATURES |
4-16 |
| 4F.01 |
General |
4-16 |
| 4F.02 |
Survey
Monuments |
4-16 |
| 4F.03 |
Mailboxes |
4-17 |
| 4F.04 |
Guard Rails |
4-17 |
| 4F.05 |
Retaining Walls |
4-17 |
| 4F.06 |
Street Trees
(Section Reserved) |
4-18 |
| |
|
|
| 4G. |
UTILITIES |
4-18 |
| 4G.01 |
General |
4-18 |
| 4G.02 |
Water Lines |
4-18 |
| 4G.03 |
Sanitary Sewers |
4-18 |
| 4G.04 |
Other Utilities |
4-18 |
| 4G.05 |
Utility
Crossings in Existing Streets |
4-19 |
| |
|
|
| 5. |
STORM DRAINAGE |
5-1 |
| 5A. |
GENERAL
CONSIDERATIONS |
5-1 |
| |
|
|
| 5B. |
DESIGN
STANDARDS |
5-1 |
| 5B.01 |
General |
5-1 |
| 5B.02 |
Conveyance |
5-1 |
| 5B.03 |
Connections |
5-1 |
| 5B.04 |
Channels |
5-2 |
| |
|
|
| 6. |
SPECIFICATIONS |
6-1 |
| |
|
|
| 6A. |
PRECONSTRUCTION
MEETING |
6-1 |
| |
|
|
| 6B. |
STAKING |
6-1 |
| |
|
|
| 6C. |
STREETS |
6-1 |
| 6C.01 |
Subgrade
Preparation |
6-1 |
| 6C.02 |
Crushed
Surfacing (Base and Top Course) |
6-1 |
| 6C.03 |
Surfacing
Requirements |
6-2 |
| 6C.04 |
Pavement
Restoration |
6-2 |
| 6C.05 |
Temporary
Street Patching |
6-3 |
| |
|
|
| 6D. |
STORM DRAINAGE |
6-3 |
| 6D.01 |
Material |
6-3 |
| 6D.02 |
Trench
Excavation |
6-3 |
| 6D.03 |
Bedding |
6-4 |
| 6D.04 |
Backfilling |
6-5 |
| |
|
|
| 6E. |
SIDEWALKS |
6-7 |
| 6E.01 |
Material |
6-7 |
| 6E.02 |
Sidewalk
Thickness |
6-7 |
| 6E.03 |
Expansion and
Contraction Joints |
6-7 |
| 6E.04 |
Form and
Subgrade Inspection |
6-7 |
| |
|
|
| 6F. |
CURB & GUTTERS |
6-8 |
| 6F.01 |
Materials |
6-8 |
| 6F.02 |
Form and
Subgrade Inspection |
6-8 |
| 6F.03 |
Subgrade
Preparation |
6-8 |
| 6F.04 |
Construction |
6-8 |
| 6F.05 |
Curing |
6-9 |
| 6F.06 |
Joints |
6-9 |
| |
|
|
| 6G. |
RETAINING WALLS |
6-9 |
| 6G.01 |
Material |
6-9 |
| 6G.02 |
Construction |
6-9 |
| 6G.03 |
Backfill |
6-10 |
| 6G.04 |
Perforated
Drainage Pipe |
6-10 |
| |
|
|
| 6H. |
TESTING |
6-10 |
| |
Testing and
Sampling Frequency Guide |
6-11 |
| |
|
|
| 7. |
STANDARD
DETAILS |
7-1 |
| |
|
|
| |
APPENDIX A -
BOND DOCUMENTS |
|
| |
Letter of
Credit |
A-1 |
| |
Assignment of
Savings Account |
A-2 |