Public Works Engineering Design Standards

NOTICE TO DEVELOPERS!

Town adopted the new Standards per Resolution No. 2724 on April 7, 2022.

All development permitted after April 7, 2022 shall be subject to the new design standards. Contact Community Development & Planning with questions.

Download the complete Engineering & Design Standards (Searchable PDF) or see below for Sections & Standard Plan Index.

Table of Contents
Section 1 - Overview (PDF)
Section 2 - Project Application & Certification (PDF)
Section 3 - General Utilities (PDF)
Section 4 - Sanitary Sewer Specifications (PDF)
Section 5 - Sewage Pump Stations (PDF)
Section 6 - Stormwater (PDF)
Section 7 - Water (PDF)
Section 8 - Streets (PDF)
  1. GENERAL UTILITY
  2. SEWER
  3. STORM
  4. STREET
  5. WATER 
Standard Drawings Download .PDF Download .DWG
General Notes U-0 (PDF) U-0 (DWG)
Typical Utility Locations U-1 (PDF) U-1 (DWG)
W, S & SW Trench Section U-2 (PDF) U-2 (DWG)
Dry Utility Layout U-3 (PDF) U-3 (DWG)
Dry Utilities & Water Main Section U-4 (PDF) U-4 (DWG)
Power/Communication Trench Section in Rock U-5 (PDF) U-5 (DWG)
Dry Utility Section U-6 (PDF) U-6 (DWG)
Trench Pavement Restoration U-7 (PDF) U-7 (DWG)
HMA Diamond Patch U-8 (PDF) U-8 (DWG)